In accordance with the technical specifications of the General Directorate of Highways, preparation of a digital implementation project for a route of 44.5, 76, and 40 km long for nationalization and, as a complementary work, making necessary topographic survey studies.
Engineering Projects for the Selim-Göle Highway
44,500 m
Engineering Projects for the Erbaa-Fatlı-Reşadiye Highway
76,000 m
Engineering Projects for the Gerger-Çermik Highway
40,000 m


