AKSARAY POTABLE WATER TREATMENT PLANT

AKSARAY POTABLE WATER TREATMENT PLANT

The main units of the plants are Upward Flow Sludge Blanket clarifiers and Rapid Sand Filters!

Process design, construction drawings, civil works, and all mechanical and electrical equipment are manufactured, procured, and installed by EKOTEK. The entire plant was completed in a very short time, such as one year, including the design period.

All critical equipment is of European origin and well-known brands of quality. Metal parts in contact with water are made of stainless steel.

The plant capacity is 60,000 m3/day and was completed at a cost of one-third compared to a plant of similar capacity